Your Own Power

Bridge power now. Permanent generation after.

Gas turbines, battery storage, and microgrids — engineered so the thing that powers your first phase becomes part of the thing that powers all of them.

An empty building earns nothing.

Waiting for a full interconnection means a finished shell sitting dark while the schedule you committed to belongs to someone else's study calendar.

On-site generation changes that schedule — but only if it's designed as the first stage of the permanent system rather than a rental you throw away.

We build on-site power as permanent infrastructure that happens to arrive first.

Scope

What we deploy

Turbines and BESS come through manufacturing partnerships and The Devon International Group's supply chain. Long-lead equipment is very often the real critical path — securing it early is part of the engineering, not an afterthought.

  • Gas turbines

    Firm capacity sized to the load profile and sequenced to the phases that need power before the interconnection can carry them.

  • Battery energy storage (BESS)

    Ride-through, ramp support, peak firming, and stable transfers between sources — the buffer that makes everything else behave.

  • Microgrid design, controls and islanding

    Transfer schemes and islanding logic engineered so the facility runs cleanly on-site, on grid, or in parallel.

  • Balance of plant, switchgear and transformers

    Fuel and interconnecting systems, medium- and high-voltage switchgear, transformers, and the civil and electrical construction around them.

  • Commissioning and energization

    Functional testing, relay verification, utility witness testing, and turnover as an operating asset.

Sequencing

Bridge to permanent

Energize early phases on on-site generation, run the interconnection in parallel, then transition to grid power with the on-site assets retained for resiliency, peak management, and dispatchable flexibility. Nothing is stranded.

Phase one on-site

Generation and storage carry the first blocks of load while the interconnection and any required upgrades advance on their own track.

Second life on grid

Once grid service arrives, the same assets become resiliency, peak management, and the flexibility that made the interconnection easier to approve.

Commercial structures

Owned, financed, or delivered as a service.

Some clients want the asset on their balance sheet. Some want capacity and availability without the capital event. We structure either, with capital partners matched to the asset — and the engineering doesn't change based on who holds the title.

Tell us your load, your site, and your target COD.

We'll walk the interconnection path with you — constraints, sequencing, and where bridge generation changes the schedule.

Book an Interconnection Consult